Zungwan - Best OEM Filling And Sealing Machine, Filling And Capping Machine Manufacturer For Food, Cosmetics, Pharmaceutical, etc.

Language
NEWS

Introduction to Zungwan Intelligent Machinery Filling and Sealing Machine Equipment Installation and Safety Regulations

December 23, 2021

1. Equipment installation 

This chapter formulates the following items for the installation of the automatic tube filling and sealing machine.

1) Unpacking inspection 

Please carefully check whether the factory inspection certificate, instruction manual, and random preparation tools in place are consistent with the packing list. Follow the instructions to check whether the machine model matches the order. If you find the machine and its damaged and affected wounds, please contact our company immediately for proper handling.

2) Equipment installation environment

The machine should be installed on a firm level ground and the height of the feet should be adjusted so that the machine is in a horizontal position. The machine should be installed in a clean and dust-free workshop. The ambient temperature should be 18-26°C and the relative humidity range of 45-65%, otherwise it will cause unstable operation of the machine and damage the electrical appliances.The power supply of this machine is three-phase five-wire alternating current, and the optional voltage is 380V/220V. The machine must be grounded reliably.This machine needs to be equipped with a clean and stable air source, the air source pressure shall not be less than 8kgf/cm2, and the air displacement shall not be less than 0.6m3/min.



2. Safety rules 

1) Before using the machine, please clean up the surrounding environment. There should be no dangerous objects and other sundries within 1 meter around the machine. 

2) Do not modify mechanical parts at will, otherwise it will cause accidents. 

3) The operator should wear lightly, and the cuffs of the clothes must be fastened and a work cap should be worn. 

4) It is forbidden to adjust the machine while the machine is running. 

5) When adjusting the filling volume, it must be adjusted by a professional (operator or maintenance technician). Before restarting the machine, it must be confirmed that the doors are well closed. Generally, it is not allowed to open the windows and doors of the main drive system. 

6) The surface of the machine is protected by a transparent organic glass door. It is not allowed to open it when it is turned on, and it is strictly forbidden to reach into the table of the working system. 

7) When an emergency occurs, immediately press the red emergency stop button, after troubleshooting, restart the machine slowly, and confirm the troubleshooting to start the host normally.

8) Run idling for 2-3 minutes before filling in each shift to check whether all parts of the machine are operating normally. It should achieve stable working conditions, balanced operation, no abnormal noise, normal operation of all regulating devices, and reliable operation of all instruments.

9) This machine should be operated by trained and qualified personnel. Others cannot operate at will, otherwise the danger of injury or damage to the machine may occur.

 

If you are interested in our machine , Please feel free contact me.

My name is Alma. My contact information is attached below.

WhatsApp:+86-13566223503   Email:pack@cnzpack.com   Wechat:+86-13566223503


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --
Chat with Us

Send your inquiry

Choose a different language
English
Polski
Deutsch
Nederlands
हिन्दी
Tiếng Việt
ภาษาไทย
العربية
italiano
Português
русский
français
Español
Current language:English